Incheon 1
Incheon waterspublicIncheon 1 is a 870 MW fixed-bottom project in Incheon waters. It holds an Electricity Business Licence first granted on 4 March 2025. Its environmental impact assessment is in main consultation after the main report was submitted on 21 April 2026. It is developed together with Incheon 2, and the two share one assessment timetable and one grid connection offer. The expected commercial operation date is a KWI model estimate, not an announced schedule.
Location & map
free membersPermits & EIA timeline
premium membersGovernment filings and related news
phases 1 and 2 mergedpremium membersWind & energy
premium membersAnalysis report · Incheon 1
buyIndividual project analysis
Technical and economic analysis of this project in one report: wind resource, turbine layout and net energy with wake, then the capital cost build-up, levelised cost of energy (LCOE) and sensitivities to wind, wake and cost.
Group analysis
recommendedAll of Incheon 1 and 2 analysed in one document, technically and economically: joint layout and wake between projects, shared grid and export route, and group-scale procurement and grid scenarios.
Group · Incheon 1, 2
public headThe two Incheon phases are developed together by the same lead developer. They share one environmental assessment timetable and one grid connection offer.
| Phase | Capacity | Status | EIA code |
|---|---|---|---|
| Incheon 1 · this page | 870 MW | Licensed 2025-03-04 · EIA main consultation | ME2025C009 |
| Incheon 2 | 600 MW | Licensed 2024-09-30 · EIA main consultation | ME2025C010 |
