Project Data Hub
Premium memberEnglish한국어
Projects / Analysis Reports / Jeonnam / Nagwol
Data as of 2026-10-24

Nagwol

Jeonnam waterspublic
영광 낙월해상풍력 · db 23
FixedUnder constructionEIA ME2019C003 · main consultation completedIndividual-law track
DeveloperMyungwoon / B.Grimm PowerKWI record
Capacity364.8 MWKWI record
RegionJeonnamYeonggwang-gun
StageUnder constructionKWI pipeline stage
Preparation period ends2027-12-31Set by the licence
EIA codeME2019C003Draft 2019-06-25
Filings on record19latest 2026-11-09
Auction2023 auction · awardedYear and result only
Expected COD2030 H1KWI model estimate

Nagwol is a 364.8 MW fixed-bottom offshore wind project in Jeonnam waters. It is now under construction. Its environmental impact assessment main consultation is complete. It was awarded in the 2023 auction. The expected commercial operation date is a KWI model estimate, not an announced schedule.

Location & map

free members
KWI project map · interactive map for Premium members

Permits & EIA timeline

premium members

Government filings and related news

premium members

Wind & energy

premium members

Analysis report · Nagwol

buy
Nagwol report · v1.1 · 2026-11-07 · English 51 pages · Korean 49 pages
Purchase options

Individual project analysis

Nagwol 364.8 MW

Technical and economic analysis of this project in one report: wind resource, turbine layout and net energy with wake, then the capital cost build-up, levelised cost of energy (LCOE) and sensitivities to wind, wake and cost.