Project data come from public records: licence decisions in Electricity Regulatory Commission minutes and environmental impact assessment reports. Wind is anchored on measurements published in those reports, normalised with ERA5 to the 2013 to 2025 mean, or else on the Global Wind Atlas converted to hub height. Depth comes from KHOA's BADA2024 bathymetry. No satellite wind maps are used.

What it is and is not

An early feasibility study, not a bankable energy yield assessment (EYA). Generation cost is a yardstick, not a bid forecast. Most wind anchors are model values from the Global Wind Atlas, not measurements, and the wake model is calibrated on North Sea data and unverified for Korean waters. Each report states its own limits.

A laptop showing wind farm engineering software

Engine ARA · report part two

Technical analysis

Each project uses its confirmed turbine or a 15 MW class reference turbine (240 m rotor, 150 m hub). TopFarm optimises the layout inside the permit area at a minimum spacing of 4.5 rotor diameters, or 3.0 to 4.0 where a denser layout was approved, and PyWake's TurbOPark model calculates wake, neighbouring farms included. Energy yield is given at P50, P75 and P90.

  1. 03Site
  2. 04Wind resource analysis
  3. 05Turbine layout
  4. 06Energy yield
  5. 07Wake and neighbouring farms
A laptop showing a project finance model with charts

Engine ARA · report part three

Economic analysis

Generation cost (LCOE) for each project covers capital and operating cost, and is based on net energy yield after wake effects, both within the farm and from neighbouring farms. Interest during construction and public waters occupation and use fees are also counted as costs. Reports give sensitivities to changes in contract term, wind, wake and cost, and show how each project's competitiveness compares with offshore wind projects nationwide.

  1. 1Method: the LCOE formula
  2. 2Policy scenario: a longer contract
  3. 3Capital cost: components and evidence
  4. 4Operating cost and occupation fee
  5. 5Sensitivity
  6. 6Position and limits