Projects / Analysis Reports / Incheon / Hanbando-1
Data as of 2026-10-08
Analysis report · coming soon

Hanbando-1

Incheon · Ongjin waterspublic
한반도해상풍력1 · one of three phases developed together with Hanbando-2 and Hanbando-3
Fixed · monopileEBL Approved · 2025-03-04EIA ME2026C011 · draft stageGrid offer sent · 2026-09-14
DeveloperOcean Windslead developer
Capacity390 MWKWI record · licence amended 2026-03-24
RegionIncheonOngjin County waters, 37.13° N 125.20° E
StagePermitted, EIA draftpublic hearing announced 2026-08-24
Area · depth79.7 km² · 42.7 msand seabed, KHOA BADA2024 depth
Export cable137.9 km · 220 kVtwo circuits, per EIA
Filings, 24 months23latest 2026-09-14, KEPCO
Expected COD2034-12model basis, bid round 2028 H1 assumed

Hanbando-1 is the first of three adjacent phases in the Ongjin waters west of Incheon. The three phases received their electricity business licenses on the same day and share one grid connection offer from KEPCO. The water is shallow and the seabed is sand, which suits monopile foundations. The Environmental Impact Assessment is at the draft stage; Ongjin County and Yeonsu District announced the public hearing in late August 2026. The expected commercial operation date is a model estimate that assumes a first-half 2028 auction, not an announced schedule.

Location & map

free members
KWI project map · member login required

Permits & EIA timeline

premium members

Project filings & related news

phases 1, 2 and 3 mergedpremium members

Wind & energy

Provisionalpremium members

ARA reports · Hanbando-1 and the Hanbando group

technical and economic analysiscoming soon
Hanbando-1 report · 41 pages
Hanbando-1 Engine ARA report cover, sample preview
Hanbando-1 Engine ARA report contents page, sample preview
Group report · Hanbando 1, 2, 3
Preview · page 1

Hanbando group · 1,125 MW · three phases

Preview · page 2

Why one group · joint layout

Report purchase is coming soon.

Group · Hanbando 1, 2, 3

public head

The three Hanbando phases were permitted together, share the KEPCO grid connection offer of 2026-09-14, and sit side by side in the same waters, so each phase loses output to the wakes of the others. Engine ARA therefore analyses them twice: once as three individual projects, and once as a group with a joint layout and a shared export route. The individual figures on this page already include the neighbours' wakes. The group analysis adds what only appears when the three are planned as one.

PhaseCapacityStatusRelation
Hanbando-1 · 한반도해상풍력1 · this page390 MWEBL Approved · EIA draftphase 1, shared grid offer
Hanbando-2 · 한반도해상풍력2375 MWEBL Approvedphase 2, shared grid offer
Hanbando-3 · 한반도해상풍력3360 MWEBL Approvedphase 3, shared grid offer