Incheon 1
Incheon waterspublic인천해상풍력1호 · developed together with Incheon 2
FixedEBL · 2025-03-04EIA ME2025C009 · main consultationGovernment-led auction track
Incheon 1 is a 870 MW fixed-bottom project in Incheon waters. It holds an Electricity Business Licence first granted on 4 March 2025. Its environmental impact assessment is in main consultation after the main report was submitted on 21 April 2026. It is developed together with Incheon 2, and the two share one assessment timetable and one grid connection offer. The expected commercial operation date is a KWI model estimate, not an announced schedule.
Location & map
free membersKWI project map · member login required
Permits & EIA timeline
premium membersGovernment filings and related news
phases 1 and 2 mergedpremium membersWind & energy
Provisionalpremium membersAnalysis report · Incheon 1
coming soonCover and contents · 38-page report · Engine ARA second edition report (accepted 2026-09-28), shown as a sample preview.
Group · Incheon 1, 2
public headThe two Incheon phases are developed together by the same lead developer. They share one environmental assessment timetable and one grid connection offer.
| Phase | Capacity | Status | EIA code |
|---|---|---|---|
| Incheon 1 · this page | 870 MW | Licensed 2025-03-04 · EIA main consultation | ME2025C009 |
| Incheon 2 | 600 MW | Licensed 2024-09-30 · EIA main consultation | ME2025C010 |