Project Data Hub
Premium memberEnglish한국어
Projects / Analysis Reports / Incheon / Incheon 2
Data as of 2026-10-24

Incheon 2

Incheon waterspublic
인천해상풍력2호 · developed together with Incheon 1
FixedEBL · 2024-09-30EIA ME2025C010 · main consultation
DeveloperØrstedwith KOEN and POSCO under an MOU
Capacity600 MWKWI record
RegionIncheonIncheon waters
StageLicensed, EIA main consultationMain report submitted 2026-04-21
Latest permit2024-09-30no amendment on record
EIA codeME2025C010Draft 2025-04-28 to 2025-07-02
Filings since 2026-0120Latest 2026-09-10, Incheon City
Expected COD2033 H2KWI model estimate

Incheon 2 is a 600 MW fixed-bottom project in Incheon waters. It holds an Electricity Business Licence first granted on 30 September 2024. Its environmental impact assessment is in main consultation after the main report was submitted on 21 April 2026. It is developed together with Incheon 1, and the two share one assessment timetable and one grid connection offer. The expected commercial operation date is a KWI model estimate, not an announced schedule.

Location & map

free members
KWI project map · interactive map for Premium members

Permits & EIA timeline

premium members

Government filings and related news

phases 1 and 2 mergedpremium members

Wind & energy

premium members

Analysis report · Incheon 2

buy
Incheon 2 report · v1.1 · 2026-11-07 · English 50 pages · Korean 48 pages
Group report · Incheon Offshore Wind 1 and 2 combined · v1.1 · 2026-11-12 · English 62 pages · Korean 56 pages
Purchase options

Individual project analysis

Incheon 2 600 MW

Technical and economic analysis of this project in one report: wind resource, turbine layout and net energy with wake, then the capital cost build-up, levelised cost of energy (LCOE) and sensitivities to wind, wake and cost.

Group analysis

recommended
Incheon Offshore Wind 1 and 2 combined 1,470 MW

All of Incheon 1 and 2 analysed in one document, technically and economically: joint layout and wake between projects, shared grid and export route, and group-scale procurement and grid scenarios.

Group · Incheon 1, 2

public head

The two Incheon phases are developed together by the same lead developer. They share one environmental assessment timetable and one grid connection offer.

PhaseCapacityStatusEIA code
Incheon 1870 MWLicensed 2025-03-04 · EIA main consultationME2025C009
Incheon 2 · this page600 MWLicensed 2024-09-30 · EIA main consultationME2025C010

Group analysis

premium members