Project Data Hub
Premium memberEnglish한국어
Projects / Analysis Reports / Jeonnam / Jindo Bobae-1
Data as of 2026-10-24

Jindo Bobae-1

Jeonnam waterspublic
진도 보배-1 해상풍력 · db 51
FixedEBL approved
DeveloperNorthland PowerKWI record
Capacity416 MWKWI record
RegionJeonnamJindo-gun
StageEBL approvedKWI pipeline stage
Preparation period ends2031-08-31Set by the licence
Filings on record6latest 2025-07-18

Jindo Bobae-1 is a 416 MW fixed-bottom offshore wind project in Jeonnam waters. It is one of the 2 projects in the group listed below.

Location & map

free members
KWI project map · interactive map for Premium members

Permits & EIA timeline

premium members

Government filings and related news

premium members

Wind & energy

premium members

Analysis report · Jindo Bobae-1

buy
Jindo Bobae-1 report · v1.1 · 2026-11-07 · English 54 pages · Korean 51 pages
Group report · Jindo Bobae Offshore Wind 1 and 2 combined · v1.1 · 2026-11-12 · English 62 pages · Korean 55 pages
Purchase options

Individual project analysis

Jindo Bobae-1 416 MW

Technical and economic analysis of this project in one report: wind resource, turbine layout and net energy with wake, then the capital cost build-up, levelised cost of energy (LCOE) and sensitivities to wind, wake and cost.

Group analysis

recommended
Jindo Bobae Offshore Wind 1 and 2 combined 560 MW licensed

All of Jindo Bobae 1 and 2 analysed in one document, technically and economically: joint layout and wake between projects, shared grid and export route, and group-scale procurement and grid scenarios.

Group · 2 projects

560 MW on recordpublic head
ProjectDeveloperCapacityStatusEIA code
Jindo Bobae-1 · this pageNorthland Power416 MWEBL approved-
Jindo Bobae-2Northland Power144 MWEBL approved-

Group analysis

premium members