Jindo Bobae-2
Jeonnam waterspublic진도 보배2 해상풍력 · db 52
FixedEBL approved · 2023-05-26
Jindo Bobae-2 is a 144 MW fixed-bottom offshore wind project in Jeonnam waters. It was first granted an Electricity Business Licence on 2023-05-26. It is one of the 2 projects in the group listed below.
Location & map
free membersKWI project map · interactive map for Premium members
Permits & EIA timeline
premium membersGovernment filings and related news
premium membersWind & energy
premium membersAnalysis report · Jindo Bobae-2
buyJindo Bobae-2 report · v1.1 · 2026-11-07 · English 52 pages · Korean 49 pages
Group report · Jindo Bobae Offshore Wind 1 and 2 combined · v1.1 · 2026-11-12 · English 62 pages · Korean 55 pages
Purchase options
Individual project analysis
Jindo Bobae-2 144 MW
Technical and economic analysis of this project in one report: wind resource, turbine layout and net energy with wake, then the capital cost build-up, levelised cost of energy (LCOE) and sensitivities to wind, wake and cost.
Group analysis
recommendedJindo Bobae Offshore Wind 1 and 2 combined 560 MW licensed
All of Jindo Bobae 1 and 2 analysed in one document, technically and economically: joint layout and wake between projects, shared grid and export route, and group-scale procurement and grid scenarios.
Group · 2 projects
560 MW on recordpublic head| Project | Developer | Capacity | Status | EIA code |
|---|---|---|---|---|
| Jindo Bobae-1 | Northland Power | 416 MW | EBL approved | - |
| Jindo Bobae-2 · this page | Northland Power | 144 MW | EBL approved | - |
