Project Data Hub
Premium memberEnglish한국어
Projects / Analysis Reports / Jeonnam / Jindo Bobae-2
Data as of 2026-10-08

Jindo Bobae-2

Jeonnam waterspublic
진도 보배2 해상풍력 · db 52
FixedEBL approved · 2023-05-26
DeveloperNorthland PowerKWI record
Capacity144 MWKWI record
RegionJeonnamJindo-gun
StageEBL approvedKWI pipeline stage
Latest permit2023-06-23Amended licence

Jindo Bobae-2 is a 144 MW fixed-bottom offshore wind project in Jeonnam waters. It was first granted an Electricity Business Licence on 2023-05-26. It is one of the 2 projects in the group listed below.

Location & map

free members
KWI project map · member login required

Permits & EIA timeline

premium members

Government filings and related news

premium members

Wind & energy

Provisionalpremium members

Analysis report · Jindo Bobae-2

coming soon
Jindo Bobae-2 Engine ARA report cover, sample preview
Jindo Bobae-2 Engine ARA report contents page, sample preview
Cover and contents · 41-page report · Engine ARA second edition report (accepted 2026-09-28), shown as a sample preview.

Group · 2 projects

560 MW on recordpublic head
ProjectDeveloperCapacityStatusEIA code
Jindo Bobae-1Northland Power416 MWEBL approved-
Jindo Bobae-2 · this pageNorthland Power144 MWEBL approved-

Group analysis

Provisionalpremium members
Source: KWI project database (Master DB) and Data Hub filings · as of 2026-10-08