Yeosu Dado #3

Jeonnam waterspublic
여수 다도3 해상풍력 · db 50
FixedEBL approved · 2023-08-02
DeveloperNorthland PowerKWI record
Capacity640 MWKWI record
RegionJeonnamYeosu
StageEBL approvedKWI pipeline stage
Preparation period ends2031-08-31Set by the licence

Yeosu Dado #3 is a 640 MW fixed-bottom offshore wind project in Jeonnam waters. It was first granted an Electricity Business Licence on 2023-08-02. It is one of the 3 projects in the group listed below.

Location & map

free members
KWI project map · member login required

Permits & EIA timeline

premium members

Wind & energy

Provisionalpremium members

Analysis report · Yeosu Dado #3

coming soon
Yeosu Dado #3 Engine ARA report cover, sample preview
Yeosu Dado #3 Engine ARA report contents page, sample preview
Cover and contents · 38-page report · Engine ARA second edition report (accepted 2026-09-28), shown as a sample preview.

Group · 3 projects

1,272 MW on recordpublic head
ProjectDeveloperCapacityStatusEIA code
Yeosu Dado #1Northland Power256 MWEBL approved-
Yeosu Dado #2Northland Power376 MWEBL approved-
Yeosu Dado #3 · this pageNorthland Power640 MWEBL approved-
Group = projects KWI records as developed together, based on the developer and SPC on record
Source: KWI project database (Master DB) and Data Hub filings · as of 2026-10-08